ADU Cost in Studio City & Sherman Oaks: 2026 Guide
Typical market ranges by ADU type, what the city's permit records show, and the local factors that move the number up or down on your lot.
These are market ranges, not our quotes.
The ranges below are typical Los Angeles market ranges published by third parties, cited at the bottom of this page. They are not FORZA CONSTRUCTION prices. Your number depends on your lot, the ADU type, utilities and finishes, and it comes from a site walk and an itemized estimate.
We wrote this guide because Studio City, our home base, and neighboring Sherman Oaks combine flat Valley lots with hillside lots, and that difference matters more to an ADU budget than almost anything else.
2026 all-in ranges by ADU type in Los Angeles.
These all-in ranges come from ADU Wizard's 2026 Los Angeles cost guide, which includes design, permits and construction.
Junior ADU (JADU), 150 to 500 sq ft
About $60,000 to $170,000. A JADU is built inside the existing house, such as a converted bedroom, so it avoids a new foundation and roof.
Garage conversion, 400 to 650 sq ft
About $140,000 to $245,000 and up. Usually the best value when the existing garage structure is sound.
Attached ADU or addition, 500 to 800 sq ft
About $180,000 to $330,000.
Detached new-build ADU, 500 to 800 sq ft
About $219,000 to $459,000 and up, or roughly $360 to $600+ per square foot all-in. A detached unit needs its own foundation, structure, utility trenching and, for new detached units, solar.
Above-garage ADU, 500 to 800 sq ft
About $220,000 to $420,000.
Why the city's numbers look lower.
A-du analyzed 16,424 finaled ADU permits in the City of Los Angeles. The median declared construction value is $45,000 for a garage or interior conversion and $110,000 for a new detached unit, or about $105 per square foot.
Those are real numbers, but declared valuation is what the city uses to calculate permit fees. It leaves out design and engineering, permit fees, utility connections and upgrades, site work, most finishes, and the contractor's overhead and profit. Use it to compare project types, not to budget yours.
What moves the number in Studio City & Sherman Oaks.
Hillside vs. flat lots
South of Ventura Boulevard, many lots in both neighborhoods are sloped. Hillside ADUs can add soils and geology reports, grading review, retaining walls, special foundations and harder access for materials. Flat lots north of Ventura are usually simpler. See our Studio City and Sherman Oaks pages for local context.
Utilities
The distance to the sewer connection, the route for water and gas, and whether your electrical service can carry a second unit can each change the budget significantly.
Size and fees
State law waives impact fees for ADUs under 750 square feet, and small units still carry fixed costs such as a kitchen, bathroom and utility connections, so cost per square foot tends to rise as units get smaller.
Type of ADU
On the city's permit records, a typical conversion declares well under half the value of a new detached build. If you have a sound detached garage, a conversion is often the most cost-effective path.
How long permits take.
According to Buildbusters' analysis of LADBS data, house and duplex permits took a median of 27 days at the counter and 178 days in regular plan check in 2025. ADU permits vary with the design and the plan check route.
The City of Los Angeles also offers pre-approved standard ADU plans, which can reduce design time. A-du publishes the list of pre-approved LA plans.
How to get a real number for your lot.
- Look up your parcel in ZIMAS for zoning and any hillside or overlay designations
- Decide on the use: rental income, family, or a home office or studio
- Note where your sewer cleanout, water meter and electrical panel are
- Book a free feasibility call. We'll review the lot, recommend an ADU type and follow up with an itemized estimate
Book a free ADU feasibility call.
Tell us about your lot in Studio City, Sherman Oaks or nearby. We'll talk through what fits, the likely permit path and the main cost drivers, then follow up with an itemized estimate.
Common questions
How much does an ADU cost in Studio City or Sherman Oaks in 2026?
Published 2026 market ranges for Los Angeles run from about $60,000 to $170,000 for a junior ADU, about $140,000 to $245,000 or more for a garage conversion, and about $219,000 to $459,000 or more for a 500 to 800 square foot detached ADU. Hillside lots south of Ventura Boulevard often land toward the higher end. These are third-party market ranges, not FORZA quotes.
Why is the median permit value so much lower than builder prices?
Declared valuation is the construction value entered on the permit, which the city uses to calculate fees. It excludes design, permit fees, utility connections, site work, most finishes, and contractor overhead and profit, so it reads well below a delivered price.
Is a garage conversion cheaper than a detached ADU?
Usually, because the foundation, walls and roof already exist. Older garages may still need a new slab or footings, reframing, insulation and new utility runs.
Are impact fees charged on small ADUs?
Under California law, ADUs under 750 square feet are exempt from impact fees. Permit and plan check fees still apply.
Related services, areas & guides.
- ADU construction in Los Angeles
- General contractor in Studio City
- General contractor in Sherman Oaks
- Valley Village & North Hollywood
- Guide: SB 9 lot splits & new homes
Where these numbers come from.
Cost ranges are third-party market estimates and permit-record medians, shown for planning only. They are not FORZA CONSTRUCTION prices.
- ADU Wizard: How Much Does an ADU Cost in Los Angeles in 2026?: aduwizard.com
- A-du: What an ADU Costs in Los Angeles (finaled-permit valuations by ZIP code): a-du.homes
- Buildbusters analysis of LADBS permit data (2025 plan check times): buildbusters.com
- A-du: City of Los Angeles pre-approved ADU plans: a-du.homes
- California HCD: Accessory Dwelling Units: hcd.ca.gov