SB 9 Lot Splits & New Homes in the San Fernando Valley
How California's SB 9 lets eligible single-family lots hold two homes or split in two, how the City of Los Angeles applies it, and how to get a project from plan check to built.
What SB 9 allows.
SB 9, also called the HOME Act, took effect January 1, 2022, and was amended by SB 450 (2024) and AB 1061 (2025). On eligible lots zoned for single-family homes, it requires cities to approve two kinds of projects ministerially, meaning against objective standards, with no public hearing:
This is a general overview, not legal advice. Eligibility is parcel-specific.
Two-Unit Development
Two homes on one single-family lot, attached or detached, or one new unit added beside an existing house. In Los Angeles these applications go to LADBS for plan check and permits.
Urban Lot Split
Splitting one single-family parcel into two. In Los Angeles these applications are filed with City Planning. A lot split can be combined with a two-unit development, with limits. Under the city's implementation memo, each new parcel must be at least 1,200 square feet and no smaller than 40% of the original lot, and the applicant must sign an affidavit of intent to live in one of the units for three years.
Key rules from City Planning's 2026 FAQ.
- Setbacks: side and rear setbacks can't exceed 4 feet. The zone's front yard setback still applies
- Parking: one covered space per unit, unless the lot is within a half-mile walk of a high-quality transit corridor, major transit stop or car-share location
- Guaranteed size: standards that would physically prevent two units of 800 square feet each can be waived
- Timeline: since SB 450, a complete application must be approved or denied within 60 days, or it is deemed approved
- Single-family zones only: lots zoned for multiple units can't use SB 9
- Tenant protections: projects can't demolish or alter rent-stabilized or recently tenant-occupied housing, and SB 9 units can't be rented for terms of 30 days or less
- ADUs: ADUs can still be added on a two-unit lot when the two-unit allowance isn't combined with a lot split
Check before you design.
LADBS points owners to ZIMAS: search your address, open Planning and Zoning, and view the SB 9 Eligibility checklist. It covers zoning, historic status, hazard and habitat screens, and rent-stabilization status.
Then look at the practical side: lot width and street frontage (a flag lot needs a 20-foot access strip), utility capacity, slope, and how construction access will work.
SB 9 is already active here.
From January 1 to November 8, 2026, 88 building permit applications in the Sherman Oaks, Encino, Valley Village and North Hollywood ZIP codes cited SB 9, out of 292 new one- and two-family dwelling applications in those same ZIP codes (our count of LADBS open data). The common project types are a new home plus an ADU, a two-unit development that keeps the existing house, and a lot split followed by two new homes.
From plan check to built.
According to Buildbusters' analysis of LADBS data, house and duplex permits in regular plan check took a median of 178 days from submittal to issue in 2025. That stretch is the best time to choose a builder and lock the budget.
Our new-build process covers site work and foundations, structural framing, rough-ins, finishes and final inspection, with one licensed contractor (CSLB #947224) accountable throughout.
Plans in plan check? Get a free preconstruction bid.
Send us your SB 9 or new-home plan set. We'll review it for constructability and return an itemized bid and schedule while your permit is still in review.
Common questions
What does SB 9 allow in Los Angeles?
On eligible single-family-zoned lots, SB 9 allows a Two-Unit Development (two homes on one lot, filed with LADBS) and an Urban Lot Split (dividing the lot into two parcels, filed with City Planning). Both are reviewed ministerially against objective standards, without a public hearing.
How do I check whether my lot qualifies for SB 9?
Look up your address in ZIMAS, open the Planning and Zoning section and view the SB 9 Eligibility checklist. It flags zoning, historic, hazard, habitat and rent-stabilization issues.
Do SB 9 units need parking?
City Planning's FAQ says SB 9 requires one covered parking space per unit, unless the lot is within a half-mile walk of a high-quality transit corridor, a major transit stop or a car-share location.
How long does SB 9 approval take?
Since SB 450, the city must approve or deny a complete SB 9 application within 60 days. Building permit plan check is a separate step, and in 2025 house and duplex permits in regular plan check took a median of 178 days.
Can I add an ADU to an SB 9 project?
ADUs can be permitted on a lot that uses the two-unit allowance, as long as that allowance isn't combined with an urban lot split.
Related services, areas & guides.
- New home construction in Los Angeles
- Framing contractor in Los Angeles
- General contractor in Encino
- Valley Village & North Hollywood
- Guide: ADU cost in 2026
Where these numbers come from.
Rules summarized from City of Los Angeles sources current as of November 2026. This is not legal advice; confirm eligibility for your parcel.
- Los Angeles City Planning: HOME Act (SB 9) FAQ, revised Aug 24, 2026: planning.lacity.gov
- LADBS: Senate Bill 9 Two-Unit Development and Urban Lot Split: dbs.lacity.gov
- Los Angeles City Planning: SB 9 Implementation Memo (revised): planning.lacity.gov
- Buildbusters analysis of LADBS permit data (2025 plan check times): buildbusters.com
- LADBS building permit applications (City of Los Angeles Open Data, dataset gwh9-jnip), our count of filings submitted Jan 1 to Nov 8, 2026: data.lacity.org