New Home Construction in Los Angeles & the San Fernando Valley

Ground-up single-family homes, duplexes, SB 9 two-unit projects and new homes paired with ADUs, built by a licensed Studio City general contractor from permit set to certificate of occupancy.

New Builds

Ground-up homes, built under one license.

A new home is the biggest project most owners will ever take on. FORZA CONSTRUCTION has been building in Los Angeles since 2010 under California license #947224, and we build new homes the same way we run every job: one licensed contractor accountable for the schedule, the trades, the inspections and the budget.

01

Single-family homes & teardown rebuilds

New houses on vacant lots and replacement homes where the existing structure has reached the end of its life, built to your architect's and engineer's stamped plans.

02

Duplexes & SB 9 two-unit projects

Two homes on one single-family lot, either as a duplex or two detached units under California's SB 9. Our SB 9 guide covers eligibility and the City of LA's rules.

03

A new home plus an ADU

Many Valley owners now build the main house and an accessory dwelling unit at the same time, sharing site work, utility trenching and mobilization costs.

Preconstruction

Already in plan check? Bring us in now.

LADBS data analyzed by Buildbusters shows that house and duplex permits in regular plan check took a median of 178 days from submittal to issue in 2025, against 27 days for over-the-counter permits. That window is the best time to line up your builder.

We review your plan set and structural drawings, flag constructability issues before they become change orders, and return a detailed, itemized bid and schedule so you know the real number before the permit is issued.

How a New Build Runs

From permit to certificate of occupancy.

01

Plans, corrections & permit

We coordinate with your architect and engineer on plan check corrections and confirm utility, sewer and site requirements early.

02

Site work, foundation & utilities

Demolition if needed, grading, foundation, and utility connections, inspected by LADBS before anything goes vertical.

03

Framing & rough-ins

Structural framing, shear walls and roof, then plumbing, electrical and mechanical rough-ins, each inspected before walls are closed.

04

Finishes & final inspection

Insulation, drywall, cabinetry, tile and fixtures, then final inspection and a walkthrough with you before the job is called complete.

Where We Build

Active new-home demand across the Valley.

New-home permits keep coming in our part of the Valley. From January 1 to November 8, 2026, LADBS received 292 applications for new one- and two-family dwellings in the Sherman Oaks, Encino, Valley Village and North Hollywood ZIP codes alone (our count of the city's open permit data).

We build across Los Angeles and the San Fernando Valley, including Studio City, Sherman Oaks, Encino and Valley Village & North Hollywood.

Preconstruction Bid

Plans in plan check? Get a free preconstruction bid.

Send us your plan set and we'll return an itemized bid and build schedule, at no cost, while your permit is still in review.

Frequently Asked

Common questions

Can you build from plans my architect already drew?

Yes. We build to your architect's and structural engineer's stamped plans and coordinate directly with them on plan check corrections, field questions and any revisions.

How long does LADBS plan check take for a new house?

It varies with the queue and the project. According to Buildbusters' analysis of LADBS data, house and duplex permits in regular plan check took a median of 178 days from submittal to issue in 2025. Simpler projects that qualify for counter plan check moved much faster, with a median of 27 days.

Can I build an ADU at the same time as my new home?

Often, yes. Building both at once lets the projects share site work, utility trenching and mobilization. Whether it works on your lot depends on zoning and setbacks, which we confirm before you commit.

Do you handle SB 9 two-unit projects?

Yes. SB 9 lets eligible single-family lots hold two units, and it allows some lots to be split. Our SB 9 guide explains the City of Los Angeles rules, and we can review your lot's eligibility with you.

Keep Reading

Related services, areas & guides.

Sources

Where these numbers come from.

  • Buildbusters analysis of LADBS permit data (2025 plan check times): buildbusters.com
  • LADBS building permit applications (City of Los Angeles Open Data, dataset gwh9-jnip), our count of filings submitted Jan 1 to Nov 8, 2026: data.lacity.org